Removing the top of the diaphragm wall using hydro demolition – Apr. 2023 (03_142) Previous Photo Looking across the shaft to the basement that will house the fans – Apr. 2023 (03_141) Next Photo Chalfont St Peter vent shaft basement constructed using secant piling – Apr. 2023 (03_143)