Looking south from the Align compound towards Frith Hill – Feb. 2023 (08_110) Previous Photo Storage pond for water removed from tunnel portal - Feb. 2023 (08_109) Next Photo TBM Florence has passed 30 metres under eastern side of the shaft - Feb. 2023 (05_299)