Secant piling rig constructing the basement – Nov. 2021 (04_527) Previous Photo Grand Union Canal looking south towards Harefield no.2 lake and the south embankment - Nov. 2021 (01_208) Next Photo Chesham Road intervention shaft looking south - Nov. 2021 (07_66)